Before the current situation analysis, the land where the business/building is located is evaluated according to climatic conditions, external factors and the purpose of serving, and the items with the highest energy consumption are determined by the approach method.It is of great importance in terms of recognizing the facility or building. Consumption points that were evaluated superficially in the preliminary study are examined comprehensively.
As a result of the measurements, the performances of the currently energy-consuming equipment are evaluated and compared with the factory label values; Efficiency calculations are reported.Energy consuming equipment is classified according to energy consumption items and the current situation Evaluation is made with the data obtained in the analysis.
During the study, without interfering with the routine operation in the facility, In the measurements and analyzes that will take place in the enterprise, which measurement How long the work will be done at the points is determined and the management is informed. It is not only machinery and equipment that constitute the energy expenses of the facility or building; Energy management style and personnel energy awareness level are evaluated in this respect.
The results of the measurement are shared with the management by making productivity-enhancing project studies that reduce energy consumption and/or improve production.Initial investment for appropriate work by prioritizing suggestions that will reduce energy consumption to minimum levels in shared productivity-enhancing projects cost, savings from the investment and payback periods are evaluated.
Our expert team, working in the energy-consuming equipment of the facility or building, performs survey measurements with calibrated and certified measuring devices at certain periods. All of the energy consumption points will be measured and analyzed by our professional team. We have 12 energy efficiency measurment devices. Some measurments we take snapshot of the system but some measurment take two or three weeks.
All measurement / evaluation / project design studies are prepared in accordance with the report format determined by the General Directorate of Electrical Works of the Ministry of Energy and presented to the management. All measurments and energy consumption problems report to the customer. Also solution for energy usage problem determined by our team.
About us
SKT ENERGY can determine all energy consumption problems of the power plants by analyzing more than 1000 data for each building with its technological energy measurement devices and the energy analysis simulation developed within it. Thus, the most efficient and correct solutions for energy consumption problems are presented with a holistic approach.
Contact us
- info@sktenerji.com
- +90 532 287 2168
- +964 751 199 4794
- Atatürk Mahallesi Alemdağ Cad. Akyol Apartmanı Apt.No:80/7 Ümraniye
- Ostim OSB Mahallesi 1392.Cad. No:1/15 Yenimahalle/Ankara-Turkey
- Italy City 1 No:272 Erbil/ Iraq